Numbers on India’s clean energy move quickly, so here is a snapshot you can bookmark: where each major source of renewable energy capacity stands today, what is driving it, and what is still missing. It draws on a government backgrounder published on 13 November, after the Bharat Renewable Energy Summit and Expo in New Delhi.

The big picture

India’s total installed power capacity is around 560 GW (October 2026), up from 249 GW in 2014. Non-fossil capacity was 308 GW on 31 July 2026, or 55 per cent of the total. India ranks third in the world for renewable capacity and invested USD 63.7 billion in the sector between July 2024 and June 2026. (We marked the 300 GW crossing in India’s 300 GW non-fossil milestone, and the summit’s target of another 500 GW in this report.)

Renewable energy capacity, source by source

Rooftop solar panels on homes in Mehsana, Gujarat, India

Solar: about 175 GW (31 October 2026), up from 2.8 GW in 2014 and the biggest piece of the renewable pie. India added more than 37 GW in 2025, the world’s second-largest solar growth market after China, ahead of the US at 34 GW. The household programme PM Surya Ghar: Muft Bijli Yojana (outlay Rs 75,021 crore) has put rooftop solar on 65.26 lakh homes, with 19.1 GW commissioned, about Rs 35,800 crore of subsidy paid (as of November 2026) and nearly 21 lakh households reporting zero electricity bills. A new floating solar scheme, PM Surya Sarovar Yojana (approved 31 July 2026, Rs 5,070 crore), targets 5,000 MW of floating solar with at least two hours of battery storage (10,000 MWh). More on this in our solar growth and rooftop solar coverage.

Wind: 59.20 GW (29 October 2026), fourth in the world. FY 2025-26 saw a record 6.05 GW added, 46 per cent more than the year before, and around 28 GW is under implementation. Turbine manufacturing capacity is about 24 GW with 70-80 per cent local content. A Rs 7,453 crore support scheme backs 1 GW of offshore wind.

Hydro: 57.49 GW (large and small hydro). It provides flexible, round-the-clock power that complements solar and wind. A Small Hydro Power Development Scheme (March 2026, Rs 2,584.60 crore) targets about 1,500 MW from 1-25 MW projects, especially in hilly and north-eastern regions. For storage, see our explainer on pumped storage, India’s “water battery”.

Bio-energy: 11.75 GW of bio-power, plus a growing compressed biogas (CBG) industry. As of 2 November, 839 CBG plants were registered, 210 commissioned and 255 under construction. Waste-to-energy stands at 324.24 MW grid-connected and 554.16 MW off-grid. The new GOBARdhan National Circular Bioenergy Scheme (approved 6 August 2026, Rs 23,731 crore over ten years) aims to raise domestic CBG output nearly ten-fold. See our piece on the GOBARdhan compressed biogas scheme.

Green hydrogen: targets 5 million tonnes a year by 2030 under a Rs 19,744 crore mission. Indian firms have signed 5.5 lakh tonnes a year of offtake commitments, more than 70 per cent earmarked for export, while commissioned capacity was about 8,000 tonnes a year by February 2026. Twelve pilot projects will deploy 70 hydrogen vehicles, and India’s first hydrogen train began running on the Jind-Sonipat section in July 2026.

Geothermal: early days. India notified a National Policy on Geothermal Energy on 15 September 2025. The Geological Survey of India estimates potential of about 10,600 MW based on 381 hot springs, with 42 promising sites. Five projects were sanctioned in July-August 2025, including a pilot plant and a solar-geothermal hybrid.

Reading the numbers with care

A few notes keep the numbers honest.

  • Capacity is not generation. Solar and wind produce power only part of the day. Storage, transmission and flexible grids decide how much of that capacity is actually used. Ember estimated that India curtailed about 2.3 TWh of solar between May and December 2025, mostly for grid-security reasons, and flags transmission delays as a bigger structural problem.
  • Dates differ. Different government releases quote different cut-off dates (for example, subsidy paid under PM Surya Ghar is quoted at about Rs 28,000 crore in a July snapshot and Rs 35,800 crore in November), so compare numbers only within the same release.
  • Fossil fuels remain. 45 per cent of capacity is still fossil-based, and coal remains a large share of actual generation.

Why it matters for everyday readers

For households, the most tangible piece is rooftop solar and falling tariffs. For farmers and small towns, it is solar pumps, biogas and small hydro. For the climate, it is the pace at which clean capacity displaces coal. India’s target of 500 GW of non-fossil capacity by 2030 is within reach on current additions; the harder work is making the grid ready for it. Keep up with our sustainable energy coverage for the next steps.